| S.N. |
CLIENT |
DESCRIPTION |
| 32 |
KAZAH
GAS-KAZAKHSTAN |
URALSK
HOTEL
Transportation of various project materials for
construction of 100 room hotel for the joint venture
form Iran, Turkmenistan & Red sea housing
±52,000 freight ton cargo on a door to
door basis. |
| 33 |
RED
SEA HOUSING |
ASSAB
HOUSING CAMP
Shipping arrangements of 11500 CBM of various
project materials from Europe and various Gulf
Countries to the project site by Sea, Air &
Land. |
| 34 |
RED
SEA HOUSING |
A
THYRAU HOTEL
Shipment of all project materials from Europe
for 103 room hotel including all furnitures and
fittings etc. via Bandar Abbas port by sea and
from road to door to door basis. Total volume
18,000 CBM. |
| 35 |
DABBAGH
GROUP AL MATY |
CAPISHELF
HOUSING
Arrangements of 25 over dimensional shipments
from Uzbakistan to the site;as well as shipment
of all fittings & accessories ±8,000
CBM |
| 36 |
DABBAGH
GROUP |
AIOC
CAMPS
Movements of 500 units of Port-Cabins from UAE
to the project site by 8 charted vessels form
Dubai to Iran & 500 trailer loads to Bandar
Abbas to the site including import export and
other formalities on door to door basis. |
| 37 |
BELLELI
HEA vy SAUDI
INDUSTRIES, JEBEL ALI |
JEBEL
ALI POWER STATION
Shipments of steel works for storage tanks and
other project cargoes including shipments of equipments,
cranes, heavy duty equipments desalination units,
pressure vessels etc. from various suppliers in
Europe and Gulf states on a door to door basis. |