S.N. CLIENT DESCRIPTION
32 KAZAH GAS-KAZAKHSTAN URALSK HOTEL
Transportation of various project materials for construction of 100 room hotel for the joint venture form Iran, Turkmenistan & Red sea housing ±52,000 freight ton cargo on a door to door basis.
33 RED SEA HOUSING ASSAB HOUSING CAMP
Shipping arrangements of 11500 CBM of various project materials from Europe and various Gulf Countries to the project site by Sea, Air & Land.
34 RED SEA HOUSING A THYRAU HOTEL
Shipment of all project materials from Europe for 103 room hotel including all furnitures and fittings etc. via Bandar Abbas port by sea and from road to door to door basis. Total volume 18,000 CBM.
35 DABBAGH GROUP AL MATY CAPISHELF HOUSING
Arrangements of 25 over dimensional shipments from Uzbakistan to the site;as well as shipment of all fittings & accessories ±8,000 CBM
36 DABBAGH GROUP AIOC CAMPS
Movements of 500 units of Port-Cabins from UAE to the project site by 8 charted vessels form Dubai to Iran & 500 trailer loads to Bandar Abbas to the site including import export and other formalities on door to door basis.
37 BELLELI HEA vy SAUDI
INDUSTRIES, JEBEL ALI
JEBEL ALI POWER STATION
Shipments of steel works for storage tanks and other project cargoes including shipments of equipments, cranes, heavy duty equipments desalination units, pressure vessels etc. from various suppliers in Europe and Gulf states on a door to door basis.
 